01

Consultation and sizing

We work out the volume you need together, starting from what the project or the permit requires. We tell you which of the eighteen models fits and what installation on your site involves.

Request This Service
02

The foundation design

The foundation is designed from the geological survey of the ground. We take care of the design and tell you exactly what has to be built before the tank arrives.

Request This Service
03

Delivery

We deliver two to three weeks from the confirmation of the order. Confirmation means a signed contract, the advance received, the foundation design done and the site prepared.

Request This Service
04

Installation and commissioning

Installation takes ten days from the moment the ground is ready. We need access for machinery and water and power no more than 15 metres from the site. At the end we run the leak test and hand the tank over in service.

Request This Service
05

Service and maintenance

We stay available after commissioning, for inspections and for work on the accessories and the fittings.

Request This Service